N/A
Dryer Construction All components such as heat exchangers, refrigerant circuit, condensate separator, and drain are conveniently accessible when the side panels are removed. Service connections are provided at the suction and discharge lines to check the refrigerant circuit. The dryer construction and component arrangement minimize the floor space required for installation.
- Easy and Reliable Controls
Control panel includes dew point indicator, on/off switch, and LED's indicating "power on" (active thermal storage) and "compressor on." LED's for "high dew point" are standard on models TE 91 and up and drain alarm LED is standard on TE 121 thru TF 251.
- Heat Exchangers
Air-to-air and thermal storage-to-refrigerant heat exchangers are fitted with oversized copper tubing that provides low pressure drop. The smooth inner walls of the tubing also prevent fouling. Three-year warranty on heat exchangers. Two-year warranty on all other parts and labor.
- Thermal Storage
Solid media acts as storage for efficient cooling and eliminates the possibility of leakage.
- Electronic Demand Drain
Once condensate fills the collection chamber, a level sensor opens a diaphragm valve to drain the condensate. The valve then shuts before costly air can escape.
- Separator
Highly efficient multistage, stainless steel separator uses centrifugal force and a stainless steel wire mesh to separate 99.9% of liquid water.
|